- Type
- Commercial cut and replace
- Purpose
- Water filtration system for a detail bay
- Location
- Waverly, NY
Inside a working shop
After the floor was saw cut, we removed the concrete, dug the trench and ran the drain line to a new floor drain.
Outside
Outside the building we excavated for the tank and riser with the mini excavator, made the connection and backfilled with stone.
Patched back
Inside, the trench was filled and the floor patched with new concrete beside the new filtration unit.
